The plant of PISA in Tlajomulco, Jalisco, started in 2009 as part of its expansion strategy in medical solutions, continues to grow with new stages of operation. In its most recent phase, aimed at administrative offices and laying the foundations for production of dialysis solutions, Metal Duct participated with the manufacturing of more than 300 meters of spiroduct, as well as high-quality connections for the HVAC system.
The Challenge
- Serve a reference client in the pharmaceutical industry, where the reliability and certification of materials are key factors.
- Meet the deadlines for an initial phase that was to be operational without delay.
- Guaranteeing the production of pipelines and fittings that meet the highest quality standards, ready to be integrated into a project that has been constantly expanding since 2009.
The Solution
Thanks to our productive capacity and experience in highly relevant industrial projectsAt Metal Duct, we deliver certified 100% HVAC ducts and fittings, meeting the quality requirements of the pharmaceutical industry. This ensures that the PISA plant has a reliable HVAC system, ready to evolve with the future stages of this complex, which began more than a decade ago.